Articles | Open Access | https://doi.org/10.55640/ijbms-06-10-02

Inter-Team Interfaces as the Primary Source of Losses in Large-Scale Projects

Nikolaev Denis , Project manager, hh.ru Dubai, UAE

Abstract

Large-scale software projects routinely involve multiple autonomous teams whose internal processes are well-established yet whose joint output repeatedly falls short of schedule and cost targets. This paper argues that the dominant source of those losses is not within-team inefficiency but the coordination overhead generated at the points where one team's decisions must be accepted and acted upon by another. Drawing on a dual-case study from hh.ru (a major Russian labor-market platform employing more than 2,000 staff), the study compares two product launches of comparable technical scope but different inter-team topology: a three-team voice-call feature completed in six months and ranked among the company's top 18 projects of the year, and a five-team, and two senior leaders (hereafter Direction Lead A and Direction Lead B) each responsible for a distinct but adjacent major organizational direction, with no formal precedence of one over the other contact-center program characterized by substantially higher coordination friction. The analysis introduces a three-level typology of interfaces (horizontal, vertical, and cross-perimeter), identifies the non-linear growth of coordination channels consistent with Brooks's Law, and proposes the Interface Design Protocol (IDP) as a pre-launch discipline for explicitly mapping and assigning ownership of every inter-team boundary. Findings indicate that interface topology, rather than team count alone, is the decisive predictor of coordination losses. The results are relevant to project managers, program directors, and HR practitioners responsible for team structure in technology organizations.

Keywords

Inter-team coordination, coordination interfaces, large-scale agile

References

Project Management Institute. (2024, February). Pulse of the Profession® 2024: The future of project work. Retrieved January 19, 2026, from https://www.pmi.org/learning/thought-leadership/future-of-project-work

McKinsey & Company. (2023, August 1). The state of AI in 2023: Generative AI’s breakout year. Retrieved February 16, 2026, from https://www.mckinsey.com/capabilities/quantumblack/our-insights/the-state-of-ai-in-2023-generative-ais-breakout-year

Berntzen, M., Hoda, R., Moe, N. B., & Stray, V. (2023). A taxonomy of inter-team coordination mechanisms in large-scale agile. IEEE Transactions on Software Engineering, 49(2), 699–718. https://doi.org/10.1109/TSE.2022.3160873

Berntzen, M., Stray, V., Moe, N. B., & Hoda, R. (2023). Responding to change over time: A longitudinal case study on changes in coordination mechanisms in large-scale agile. Empirical Software Engineering, 28(5), Article 114. https://doi.org/10.1007/s10664-023-10349-0

Berntzen, M., Stray, V., & Moe, N. B. (2021). Coordination strategies: Managing inter-team coordination challenges in large-scale agile. In P. Gregory, C. Lassenius, X. Wang, & P. Kruchten (Eds.), Agile processes in software engineering and extreme programming (Lecture Notes in Business Information Processing, Vol. 419, pp. 140–156). Springer. https://doi.org/10.1007/978-3-030-78098-2_9

Dingsøyr, T., Bjørnson, F. O., Schrof, J., & Sporsem, T. (2023). A longitudinal explanatory case study of coordination in a very large development programme: The impact of transitioning from a first- to a second-generation large-scale agile development method. Empirical Software Engineering, 28(1), Article 1. https://doi.org/10.1007/s10664-022-10230-6

Šmite, D., Moe, N. B., Floryan, M., Gonzalez-Huerta, J., Dorner, M., & Sablis, A. (2023). Decentralized decision-making and scaled autonomy at Spotify. Journal of Systems and Software, 200, Article 111649. https://doi.org/10.1016/j.jss.2023.111649

Yin, R. K. (2018). Case study research and applications: Design and methods (6th ed.). SAGE Publications.

Vedal, H., Stray, V., Berntzen, M., & Moe, N. B. (2021). Managing dependencies in large-scale agile. In P. Gregory & P. Kruchten (Eds.), Agile processes in software engineering and extreme programming – Workshops (Lecture Notes in Business Information Processing, Vol. 426, pp. 52–61). Springer. https://doi.org/10.1007/978-3-030-88583-0_6

Dingsøyr, T., Moe, N. B., & Seim, E. A. (2018). Coordinating knowledge work in multiteam programs: Findings from a large-scale agile development program. Project Management Journal, 49(6), 64–77. https://doi.org/10.1177/8756972818798980

Leicht-Deobald, U., Backmann, J., de Vries, T. A., Weiss, M., Hohmann, S., Walter, F., van der Vegt, G. S., & Hoegl, M. (2025). A contingency framework for the performance consequences of team boundary management: A meta-analysis of 30 years of research. Journal of Management, 51(2), 704–747. https://doi.org/10.1177/01492063231206107

Rodriguez-Escudero, A. I., Carbonell, P., Perez-Fernandez, H., & Temprano-Garcia, V. (2025). Examining the role of team boundary buffering as a proactive and reactive stress intervention for boundary spanning new product teams. Journal of Engineering and Technology Management, 75, Article 101861. https://doi.org/10.1016/j.jengtecman.2025.101861

Wagner, J. A., III. (2024). Inter-team coordination in multiteam systems: Mechanisms, transitions, and precipitants. Organizational Psychology Review, 14(3), 425–448. https://doi.org/10.1177/20413866231153537

Leicht-Deobald, U., Lam, C. F., Bruch, H., Kunze, F., & Wu, W. (2022). Team boundary work and team workload demands: Their interactive effect on team vigor and team effectiveness. Human Resource Management, 61(4), 465–488. https://doi.org/10.1002/hrm.22104

Standish Group International. (2020). CHAOS report: Beyond infinity. Retrieved May 27, 2026, from https://www.standishgroup.com/products/copy-of-chaos-report-beyond-infinity-digital-version

Project Management Institute. (2021). The standard for project management and a guide to the project management body of knowledge (PMBOK® guide) (7th ed.).

Gote, C., Mavrodiev, P., Schweitzer, F., & Scholtes, I. (2022). Big data = big insights? Operationalising Brooks’ law in a massive GitHub data set. In Proceedings of the 44th International Conference on Software Engineering (pp. 262–273). Association for Computing Machinery. https://doi.org/10.1145/3510003.3510619

Biesialska, K., Franch, X., & Muntés-Mulero, V. (2021). Mining dependencies in large-scale agile software development projects: A quantitative industry study. In Proceedings of the 25th International Conference on Evaluation and Assessment in Software Engineering (EASE 2021) (pp. 20–29). Association for Computing Machinery. https://doi.org/10.1145/3463274.3463323

Strode, D., Dingsøyr, T., & Lindsjørn, Y. (2022). A teamwork effectiveness model for agile software development. Empirical Software Engineering, 27, Article 56. https://doi.org/10.1007/s10664-021-10115-0

Chang, J. Y. T., Wu, X., Discenza, R., & Klein, G. (2022). Creative software development with team boundary management. Journal of Computer Information Systems, 62(4), 694–705. https://doi.org/10.1080/08874417.2021.1903366

Wu, X., Tsai, J. C.-A., & Lei, Y. (2023). Information technology project management research: A review of works by influential pioneers. Project Management Journal, 54(4), 366–391. https://doi.org/10.1177/87569728231171056

Article Statistics

Downloads

Download data is not yet available.

Copyright License

Download Citations

How to Cite

Nikolaev Denis. (2026). Inter-Team Interfaces as the Primary Source of Losses in Large-Scale Projects. International Journal of Business and Management Sciences, 6(10), 10-19. https://doi.org/10.55640/ijbms-06-10-02